Tuesday, April 21, 2009

Wrap it up

Installing the instrument cluster, the headlight, adding fluids, adjusting things, double checking nuts and bolts, . . . . . finishing touches. I have video that is dated April 18 that is of the first start-up and alley test ride but I was still finishing things like wiring and such up until this day.
2009-04-21 006
I had an issue with the shock absorbers; they would collapse as I was riding until the fender was into the tire. When I parked it they would slowly extend. This is not good. I swapped them out with a used pair that worked a little better.

No comments: